Tag: Seti River

India Extends Export Approval for 96.5 MW from Four Hydropower Projects

Kathmandu — India has renewed approval for the export of 96.50 MW of electricity from four hydropower projects in Nepal. The projects whose export...

Floods and Landslides Damage Power Infrastructure Nationwide; NEA Mobilises Repair Teams

Kathmandu, September 27, 2026 (11 Asoj 2083 BS) — Continuous rainfall, windstorms, floods, landslides and lightning have damaged electricity transmission and distribution infrastructure at...

Tanahu Hydropower Project’s Main Dam Construction Reaches 62% Completion

Damuli: Construction of the main dam of the 140-megawatt Tanahu Hydropower Project, under construction in Rishing Rural Municipality of Tanahu, has gained momentum. So...

Seti Khola Hydropower Project Starts Supplying Electricity to National Grid

Kaski: The 22 MW Seti Khola Hydropower Project, constructed in Pokhara Metropolitan City–33, Kaski, has started generating electricity. Power produced by the project, promoted...

126 MW Lower Seti Hydropower Project Determines Compensation for Land Acquisition

Tanahun, Nepal: Compensation rates have been determined for structures located on land to be acquired for the construction of the 126 MW Lower Seti...

Tanahun Hydropower Expands Community Works, Completes 96 Infrastructure Schemes

The 140 MW Tanahun Hydropower Project under construction at Jhaputar, Rishing Rural Municipality-1, is implementing seven development schemes in the affected areas under its...

Tanahun Hydropower Main Dam Construction Reaches 50% Completion

Damauli — Construction of the main dam of the under-construction Tanahu Hydropower Project in Rishing Rural Municipality of Tanahun district has gained momentum. Under Package...

Lower Seti Hydropower Project: Tunnel Construction Begins on 126 MW Cascade...

Kathmandu: Construction of the access tunnel for the 126 MW Lower Seti Hydropower Project has begun. The project, fully owned by the Nepal Electricity...

Supreme Middle Seti Hydropower Project Set for Construction in Kaski

Kathmandu: A 18 MW capacity Suprim Middle Seti Hydropower Project is set to be constructed in Kaski district of Gandaki Province. The project is being...

Land Acquisition Begins for 126 MW Lower Seti Hydropower Project in...

Tanahun: Land acquisition has begun for the 126 MW Lower Seti Hydropower Project, which is set to be constructed in Tanahun district. The project will...

MOST POPULAR

HOT NEWS