Tag: Nepal Electricity Authority
41 MW added to national grid in first nine months
Apr 17, 2019
The Nepal Electricity Authority commissioned six medium and small hydropower projects and one solar plant in the first nine months of this...
Upper Trishuli-3A, Kulekhani-3 plants nearing finish
Apr 15, 2019
The Upper Trishuli 3A Hydropower Project is on track to come online in a few weeks with workers putting the final touches...
Forces behind lenghty power cuts trying to weaken me: Ghising
KATHMANDU, April 9: Nepal Electricity Authority (NEA) Managing Director Kulman Ghising on Monday said that certain forces, which forced people to live without electricity...
Work resumes in Koshi Corridor
Kathmandu, April 8
Work on Koshi Corridor Transmission Line has resumed after the Nepal Electricity Authority (NEA) has resolved differences with the locals of Dharan...
वीरगन्ज–परवानीपुर ६६ केभी प्रसारण लाइन सञ्चालनमा
बुधवार, चैत्र २०, २०७५
हुण्डरीले पोल ढालेपछि अवरुद्ध वीरगन्ज–परवानीपुर ६६ केभी डबल सर्किट विद्युत् प्रसारण लाइन सञ्चालनमा आएको छ । बेलुकी ४ बजेबाट दुवै सर्किट सञ्चालनमा...
माथिल्लो त्रिशूली–१ : हेजिङको रकम तिरेर सरकारले बिजुली लिने
चैत्र १९, २०७५
काठमाडौँ — माथिल्लो त्रिशूली–१ आयोजनाबाट सरकारले १७ प्रतिशत विद्युत् लिने भएको छ । हेजिङ फन्डमा २१६ मेगावाटको यो आयोजनाले तिर्नुपर्ने बापतको रकम सरकारले व्यहोरेदिने...
प्राधिकरणको रु १५ करोड क्षति, मङ्गलबारसम्म विद्युत् सञ्चालन गरिने
काठमाडौँ, चैत १८ गते । आइतबार साँझ आएको हावाहुरीका कारण नेपाल विद्युत् प्राधिकरणको रु १५ करोड बराबरको क्षति भएको छ । बारा र पर्सा...