Tag: Load Dispatch Center

Kulekhani steps up flood preparedness with sirens, SMS alerts for downstream...

Kathmandu: Kulekhani-I Hydropower Center has intensified measures ranging from maintaining lower reservoir water levels to strengthening early warning systems in downstream areas. As part of...

Tomorrow there will be no electricity for 8 hours in these...

Tomorrow (Saturday) the supply will be stopped in some places of Kathmandu and Lalitpur. According to the Nepal Electricity Authority, the power will be affected...

अत्याधुनिक बन्यो विद्युत् भार प्रेषण केन्द्र

काठमाडौं,१९ असोज २०७६। मुलुकभरको विद्युत् व्यवस्थापन र नियन्त्रण गर्ने भार प्रेषण केन्द (एलडीसी) अत्याधुनिक बनेको छ । २०७२ वैशाखको विनाशकारी भूकम्पबाट क्षति पुगेको केन्द्रको...

MOST POPULAR

HOT NEWS