Tag: Chilime Hydropower Project
Rasuwa Flood Disconnects 260 Megawatts from National Grid
Kathmandu — Minister for Energy, Water Resources and Irrigation, Deepak Khadka, has stated that around 260 megawatts of electricity has been disconnected from the...
IPPAN calls for govt initiation to restore damaged power structures
KATHMANDU, July 10: The Independent Energy Producers' Association, Nepal (IPPAN) has urged the government to make arrangements for restoring electricity infrastructure damaged by the...
Electricity Authority Discloses Damage Caused by Rasuwa Flood
The flood that occurred in the Bhotekoshi River on Tuesday morning has damaged hydropower projects.
The Authority has stated that 250 megawatts of...
NEA Electrifies 95% of Population, Gears Up for IPO
The Nepal Electricity Authority (NEA) has said that 95 per cent of the country's total population has access to electricity.
Speaking at a press conference...
Power generation from Chilime Hydropower stopped due to maintenance
Kathmandu. Power generation has stopped at Chilime Power Station due to equipment replacement work. The 22-megawatt Chilime Hydropower Station has stopped generating electricity to...