50 MW Upper Marsyangi “A” Hydroelectric Project Begins Operation
26th September: Upper Marsyangi – A Hydroelectric Project (50 MW) commenced power generation on Monday. On this occasion, the Power Generation ceremony of the project was held with much gusto on the same day. The ceremony’s Chief Guest, Honorable Minister Mr. Janardan Sharma (Ministry of Energy) and the DCM of Chinese Embassy to Nepal Mr. Cheng Ji graced the occassion with their presence.