The Nepal Electricity Authority (NEA) has signed a Power Purchase Agreements (PPA) to buy electricity generated from Lower Khoranga Hydro Power Project which has 5.5 MW of generation capacity.
Jagdishworman Singh, the deputy managing director of the NEA and Senior Engineer Prem Prakash Pandey, IDS Energy Pvt. Ltd. has signed the pact on behalf of their respective organization.