Tag: Kathmandu

NEA MD Shakya Inspects Flood-Damaged Rasuwagadhi Hydropower Project

Kathmandu: Managing Director of the Nepal Electricity Authority, Hitendra Dev Shakya, has conducted an on-site inspection to review the latest progress of the 111-megawatt...

Tehrathum Power to Invest Rs 10 Million in Lalupate Hydropower

Kathmandu: Tehrathum Power Company Limited has decided to acquire 100,000 shares of Lalupate Hydropower Company Limited at a face value of Rs 100 per...

Subdivision of Land Beneath Electric Transmission Lines Now Permitted

Within the area of land that falls under the transmission line right of way, the construction of houses or other structures, the planting of...

Kathmandu Underground Electric Wires to Proceed: ‘If Not Now, It May...

Kathmandu, 7 December 2025 – The work of undergrounding electric wires within the Kathmandu Metropolitan City area will be carried out in coordination with...

Supreme Court Rejects Petition to Stop Hydropower Project in Langtang National...

Kathmandu. The Supreme Court has dismissed the petition filed demanding a halt to the construction of a hydropower project inside the national park area. A...

Agreement Reached After Collateral-Based Settlement Proposal in Power Tariff Row

Kathmandu — The government and industrialists have reached an agreement on the dispute over dedicated and trunk line electricity tariffs after allowing the first...

Kulman Ghising Proposes Sustainable Trolley Bus Network for Urban Nepal

Kathmandu — Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development, Kulman Ghising, has requested Germany’s support for conducting...

Upper Bhotekoshi Hydropower Reopens, Local Communities Gain 10% Ownership

Kathmandu — The 45-megawatt Upper Bhotekoshi Hydropower Project, which had been halted for about a month due to the so-called "Genji movement," is set...

Vehicular Movement Resumes on BP Highway After Flood and Landslide Repairs

Kathmandu, 10th October — The BP Highway, which connects the federal capital Kathmandu with the districts of Bagmati, Madhesh, and Koshi provinces, has come...

Home Minister Orders Restart of Bhotekoshi Hydropower After Gen Z Free...

Kathmandu — Home Minister Om Prakash Aryal has directed that the Upper Bhotekoshi Hydropower Project, which was shut down after demands for free shares...

MOST POPULAR

HOT NEWS