Tag: infrastructure damage

Kaligandaki ‘A’ Set to Resume Power Generation as River Level Recedes

Kathmandu: The 144 MW Kaligandaki ‘A’ Hydropower Project, which has remained shut for the past four days due to flooding in the Kaligandaki River,...

Floods and Landslides Damage Power Infrastructure Nationwide; NEA Mobilises Repair Teams

Kathmandu, September 27, 2026 (11 Asoj 2083 BS) — Continuous rainfall, windstorms, floods, landslides and lightning have damaged electricity transmission and distribution infrastructure at...

India Approves 18-Hour Daily Power Exports to Nepal Until Dec. 31

KATHMANDU, Sept 15: India has approved the export of electricity to Nepal for 18 hours a day until December 31, following last month’s devastating...

Army Vows No Halt to Search for Those Trapped in Hydropower...

Kathmandu: The Nepal Army has said that search and rescue operations inside tunnels of flood-damaged hydropower projects will continue until breakthrough access is achieved...

Landslides Cut Power Across Bajura After 32 Poles Collapse

Bajura: Electricity service through the national transmission line has been disrupted across Bajura after continuous rainfall triggered landslides that damaged power infrastructure. Power supply...

Floods in Budhigandaki and Therang Khola Destroy Two Hydropower Projects

Gorkha: Floods in the Budhigandaki River and Therang Khola at Namrung in Chumnubri Rural Municipality-4 of northern Gorkha have swept away two bridges and...

SEBON Directs NEPSE to Closely Monitor Trading of Flood-Affected Listed Companies

Kathmandu: Following the devastating floods and natural disasters that have damaged hydropower projects, transmission infrastructure and other physical assets in various Himalayan and riverbank...

Energy Minister Shrestha Reaches Trishuli, Holds Talks with Home Minister on...

Kathmandu: Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha has reached Trishuli in Nuwakot. Minister Shrestha, who reached in Nuwakot to inspect flood-affected...

Rescue Team to Reach Upper Trishuli-3B Site Tomorrow, Deployment Delayed Today...

Kathmandu — A team is being prepared to travel to the Upper Trishuli-3B Hydropower Project site in Sirupani, Kispang Rural Municipality-5 of Nuwakot on...

Floods and Landslides Force Prolonged Shutdown of 9.9 MW Iwa Khola...

Kathmandu: The 9.9 MW Iwa Khola Hydropower Project in Panchthar has remained shut down for more than three weeks after sustaining damage from floods...

MOST POPULAR

HOT NEWS