Why To Regulate Electricity Sector In Nepal?
. The Electricity Regulatory Commission has been thereafter continuing its operation after the appointment of its members and chairperson.
By Dr. Ram Prasad Dhital
Current...
Bangladesh-Nepal energy cooperation; the horizon of new possibilities
MUHAMMAD HASANUJZAMAN AND UMESH RAJ RIMAL
Bangladesh-Nepal bilateral relationship found new pace in August 2018 with the signing of an energy cooperation agreement to oversee...
प्रस्तावित विद्युत् विधेयक
१६ श्रावण, २०७७
सरकारले विद्युत् उत्पादन, प्रसारण तथा वितरण प्रणालीलाई थप प्रतिस्पर्धी बनाउन निजी क्षेत्रसमेत सहभागी हुने अवसर सिर्जना गर्नेगरी ल्याएको नयाँ विद्युत् विधेयकप्रति निजी...
लकडाउनमा ठुलो आयोजनाका काम सुरु
२६ बैशाख २०७७
धानगढी, - सुदूरपश्चिममा राष्ट्रिय गौरवलगायत ठुला आयोजनाको निर्माण कार्य सुरु भएका छन् । एक महिनाभन्दा बढी लकडाउन अवधिभर बन्द रहेका आयोजना निर्माणका...
विद्युत् क्षेत्रको अग्निपरीक्षा
उत्पादित विद्युत् खेर जान नदिन प्राधिकरण मात्र लागेर पुग्दैन, राज्यले नै विशेष नीति ल्याउनुपर्छ
विचार :प्रबल अधिकारी
विद्युत् मागको प्रक्षेपणका आधारमा विद्युत् उत्पादन र आयातको परिमाण...
Energy from the Renewable sources and its importance
18th March, 2020
Kathmandu: It is universal truth that energy is the engine of economic development. Adequate, affordable and reliable energy is required for the...
MISSION RIVER CONSERVATION
February 2, 2020
Without a paradigm shift in river conservation, the sustainable development of a nation that is striving to achieve a mid-income status by 2030...
Nuwakot, Rasuwa turning into hydro, solar hubs as investors pour money
According to the available data, 1,093 MW of electricity is being generated from Trishuli river alone.
January 19, 2020
Manorath Shrestha of Bidur had access to...
न्यू बुटवल र पूर्वी चितवन सबस्टेसनको निर्माण अन्तिम चरणमा
२० पुस, २०७६
काठमाडौं:नवलपरासीको सुनवलमा २२०÷१३२ केभी न्यू बुटवल र चितवनको भण्डारामा पूर्वी चितवन १३२÷३३÷११ केभी सबस्टेसनको निर्माण अन्तिम चरणमा पुगेको छ ।
दुवै सबस्टेसनको निर्माण...
Denizens troubled as demand surge strains Kathmandu’s poor electricity grid
The power utility has not been able to reinforce the decades-old infrastructures.
January 4, 2020
Kathmandu: Sunil Thakur is a 23-year-old barber who runs a saloon...