Tag: Myagdi Khola-B Hydropower Project
Construction Underway for Myagdi Khola-B Project, Commercial Operation by 2028
Kathmandu — A 12.5 MW Myagdi Khola-B Hydropower Project is set to be constructed.
The project will utilize the water from the Myagdi River located...