Tag: Bara-Parsa Industrial Corridor

Urgent Appeal for Immediate Resolution: Reconnecting Power Lines to Bara-Parsa Industrial...

Parsa-Birganj Chamber of Commerce and Industry is urgently calling for the immediate reconnection of electricity lines to six industries within the Bara-Parsa industrial corridor...

Flexible Payment Options: Settle Dedicated and Trunk Line Dues in up...

KATHMANDU, Jan 2: The Nepal Electricity Authority (NEA) has arranged for consumers who used electricity from dedicated and trunk lines to pay the electricity...

Industry of Bara-Parsa Industrial Corridor urged to get electricity from 132...

Process of construction of high capacity transmission line started Kathmandu, 6 March 2022,  Nepal Electricity Authority (NEA) has called upon the industries of Bara-Parsa Industrial...

Nepal Electricity Authority’s campaign to increase electricity consumption in Bara-Parsa Industrial...

Infrastructure will be constructed in Bara-Parsa Industrial Corridor to consume 2,000 MW within 5 years, 200 MW can be given to industries immediately. Kathmandu, 05...

MOST POPULAR

HOT NEWS