Tag: Upper Tamakoshi Hydroelectric Project
Landslide Damages Upper Tamakoshi Hydropower Dam, Electricity Production Halted Amid Rising...
Kathmandu, September 28, 2024) – Continuous rainfall has triggered a landslide that has damaged the structures (headworks) of the 456 MW Upper Tamakoshi Hydropower...
Tripartite Memorandum of Understanding signed to invest in Tamakoshi 5 Hydropower...
Kathmandu, 11 August 2078. A tripartite memorandum of understanding (MoU) has been signed for loan investment in the 99.8 MW Tamakoshi Fifth Hydropower Project...
Much-awaited Upper Tamakoshi Hydro Project formally starts production from Monday
July 5, 2021
Dolakha: Electricity produced by the long-awaited Upper Tamakoshi Hydroelectric Project has been connected to the national grid from Monday.
The 456-MW national pride...