Tag: Upper Tamakoshi Hydroelectric Project

Landslide Damages Upper Tamakoshi Hydropower Dam, Electricity Production Halted Amid Rising...

Kathmandu, September 28, 2024) – Continuous rainfall has triggered a landslide that has damaged the structures (headworks) of the 456 MW Upper Tamakoshi Hydropower...

Tripartite Memorandum of Understanding signed to invest in Tamakoshi 5 Hydropower...

Kathmandu, 11 August 2078. A tripartite memorandum of understanding (MoU) has been signed for loan investment in the 99.8 MW Tamakoshi Fifth Hydropower Project...

Much-awaited Upper Tamakoshi Hydro Project formally starts production from Monday

July 5, 2021 Dolakha: Electricity produced by the long-awaited Upper Tamakoshi Hydroelectric Project has been connected to the national grid from Monday. The 456-MW national pride...

MOST POPULAR

HOT NEWS