Tag: Makwanpur
Kulekhani steps up flood preparedness with sirens, SMS alerts for downstream...
Kathmandu: Kulekhani-I Hydropower Center has intensified measures ranging from maintaining lower reservoir water levels to strengthening early warning systems in downstream areas.
As part of...
Bhotekoshi Flood Puts Kulekhani Under Pressure to Generate Power
HETAUDA — The devastating flood in the Bhotekoshi River has damaged more than a dozen hydropower projects, putting additional pressure on the Kulekhani Hydropower...
Government Prioritizes Reservoir Hydropower, Citing Kulekhani as Role Model
Kathmandu: Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha has said that Nepal will now move forward with reservoir-based hydropower projects as...
100 MW Hydropower Expansion Planned at Kulekhani Reservoir
Nepal Electricity Authority (NEA) is preparing to generate an additional 100 megawatts of electricity using water from the Kulekhani reservoir in Makwanpur. The authority...
Kulekhani–Sisneri Pumped Storage Project Moves Forward with EIA Process in Makwanpur
Kathmandu — The Nepal Electricity Authority has initiated the construction process for the 100 MW Kulekhani–Sisneri Pumped Storage Hydropower Project in Makwanpur district. The...
NEA Begins Preparations for 100 MW Pumped Storage Project in Makwanpur
Makwanpur, Apr. 5: Preparations have begun for the construction of a 100 MW pumped storage hydropower project in Makwanpur.
The Nepal Electricity Authority (NEA) is...









