Super Nyadi Hydroelectric Project Signed the PPA

    2003

     Siuri Nyadi Power Pvt. Ltd signed a power purchase agreement (PPA) with Nepal Electricity Authority (NEA) for 40.27 MW Super Nyadi Hydropower Project. The source river of the Super Nyadi Hydropower Project is Nyadi which flows between Bahundada and Bhulbhule VDCs of the lamjung District.

    Location : Bahundada and Bhulbhule VDCs, Lamjung District.
    Type of Scheme :  Run-of-River
    Coordinates : Northing :  28o 21′ 07″ N      –     28 o 24′ 23″N
    Easting : 84 o 26′ 57″E        –     84 o 30′ 18″E
    Design Discharge : 6.99 m3/s
    Water Source : Ngadi River
    Gross Head : 690.00 m
    Installed Capacity : 40.27 MW
    Total Annual Energy : 250.87 GWh
    Dry Energy : 49.55 GWh
    Wet Energy : 201.32 GWh