• Home
  • News
  • International
  • Article
  • Events
  • Infrastructure
  • Interview
  • Notice
  • Press Release
Search
Friday, November 6, 2026
Nepal Energy Forum An independent forum and an on-line channel for the Nepal energy markets(Hydropower, Wind, Biomass, Solar, Petroleum).
  • Home
  • News
  • International
  • Article
  • Events
  • Infrastructure
  • Interview
  • Notice
  • Press Release
  • News

10,800 MW Karnali Chisapani Hydropower Project Moves Forward: Minister Kulman Ghising

December 16, 2025
1250
Share
Facebook
Twitter
WhatsApp
Email
Print

    December 16- Kailai, Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development, Kulman Ghising, has stated that a detailed engineering study is going to be carried out for the 10,800-megawatt Karnali Chisapani reservoir-based hydropower project.

    At a program organized in Durgauli, Janaki Rural Municipality, Kailali on Tuesday, Minister Ghising mentioned that the Detailed Project Report (DPR) of Karnali Chisapani, which is linked to the economic prosperity of not only the Far Western Province but also the entire country, is being prepared through the Nepal Electricity Authority.

    Referring to the fact that the project had earlier been assessed as feasible with a target to be completed by 2001, but could not move forward, Minister Ghising said that mega projects like the Karnali Chisapani, which are linked to the nation’s prosperity, must be taken forward, and that the project can be developed as a model project for the entire South Asian region.

    The government has already decided to conduct studies on the Karnali Chisapani project through the Nepal Electricity Authority. The Authority has moved forward with the process of selecting a consultant for the detailed study. Minister Ghising also stated that once the Karnali Chisapani project is constructed, river flow will be regulated, and as a result, the existing problem of riverbank erosion will also be resolved in the long term.

    He also informed that the process has already been initiated to establish a company with share ownership by local people, consumer committees, and others to operate the 4.71-megawatt hydropower plant of the Rani Jamara Kulariya Irrigation Project.

    Providing information that the proposal to establish the company has been sent to the Ministry of Finance for consent, Minister Ghising said that once approval is received from the Finance Ministry, a decision will be taken by the Cabinet, after which the process of company formation will move forward. He also noted that economic prosperity of Sudurpashchim Province can be achieved through the development of hydropower and tourism.

    Share
    Facebook
    Twitter
    WhatsApp
    Email
    Print
      Previous article145 Power Transmission Line Projects Under Study to Strengthen Nepal’s Electricity Grid
      Next articleDeforestation Surges Ahead of Upper Arun Project Construction
      OnlineNEF@Nepal

      RELATED ARTICLESMORE FROM AUTHOR

      News

      Only One of Seven Indian-Backed Hydropower Projects Under Construction in Nepal

      News

      Vikram Misri Begins Nepal Visit for Talks on Trade, Energy and Connectivity with PM Balendra Shah

      News

      Minister Shrestha Calls for Shift from Subsidy-Based to Investment-Driven Renewable Energy

      My Tweets

      Subscribe via Email

      Enter your email address to subscribe and receive notifications of new posts by email.

      Join 9,067 other subscribers

      MOST POPULAR

      निरन्तर बिजुली आपूर्तिको तयारी

      December 5, 2016

      महालेखा प्रतिवेदन : ऊर्जाको प्रगति असन्तोषजनक

      April 16, 2016

      Pancheswar to get staffers in a month

      March 22, 2015

      Indian-Nepali joint venture to carry out studies for three power lines

      December 5, 2019
      Load more

      HOT NEWS

      News

      Nepal Strengthens Sustainable Hydropower with New MoU

      ऐनमै नभएको कर तिर्न विद्युत् उत्पादकलाई गाउँपालिकाको ताकेता

      वर्षायाममा ४२ मेगावाट बिजुली खेर जाने

      News

      Nepal Electricity Authority Signs 25-Year Power Purchase Agreement with Dharamnagar Solar

      An independent forum and an on-line channel for the Nepal energy markets(Hydropower, Wind, Biomass, Solar, Petroleum).
      Contact us: info@nepalenergyforum.com

      POPULAR POSTS

      NEA Electricity tariff rates

      July 16, 2023

      China’s Mega-Dam on the Yarlung Tsangpo: Geopolitical and Environmental Alarm

      December 28, 2024

      Water Clouds on the Tibetan Plateau

      May 12, 2016

      POPULAR CATEGORY

      • News3949
      • Article242
      • International114
      • Infrastructure41
      • Interview21
      • Events10
      • Notice9
      • Press Release4
      © NEF Online Pvt. Ltd