• Home
  • News
  • International
  • Article
  • Events
  • Infrastructure
  • Interview
  • Notice
  • Press Release
Search
Friday, May 8, 2026
Nepal Energy Forum An independent forum and an on-line channel for the Nepal energy markets(Hydropower, Wind, Biomass, Solar, Petroleum).
  • Home
  • News
  • International
  • Article
  • Events
  • Infrastructure
  • Interview
  • Notice
  • Press Release
  • News

10,800 MW Karnali Chisapani Hydropower Project Moves Forward: Minister Kulman Ghising

December 16, 2025
803
Share
Facebook
Twitter
WhatsApp
Email
Print

    December 16- Kailai, Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development, Kulman Ghising, has stated that a detailed engineering study is going to be carried out for the 10,800-megawatt Karnali Chisapani reservoir-based hydropower project.

    At a program organized in Durgauli, Janaki Rural Municipality, Kailali on Tuesday, Minister Ghising mentioned that the Detailed Project Report (DPR) of Karnali Chisapani, which is linked to the economic prosperity of not only the Far Western Province but also the entire country, is being prepared through the Nepal Electricity Authority.

    Referring to the fact that the project had earlier been assessed as feasible with a target to be completed by 2001, but could not move forward, Minister Ghising said that mega projects like the Karnali Chisapani, which are linked to the nation’s prosperity, must be taken forward, and that the project can be developed as a model project for the entire South Asian region.

    The government has already decided to conduct studies on the Karnali Chisapani project through the Nepal Electricity Authority. The Authority has moved forward with the process of selecting a consultant for the detailed study. Minister Ghising also stated that once the Karnali Chisapani project is constructed, river flow will be regulated, and as a result, the existing problem of riverbank erosion will also be resolved in the long term.

    He also informed that the process has already been initiated to establish a company with share ownership by local people, consumer committees, and others to operate the 4.71-megawatt hydropower plant of the Rani Jamara Kulariya Irrigation Project.

    Providing information that the proposal to establish the company has been sent to the Ministry of Finance for consent, Minister Ghising said that once approval is received from the Finance Ministry, a decision will be taken by the Cabinet, after which the process of company formation will move forward. He also noted that economic prosperity of Sudurpashchim Province can be achieved through the development of hydropower and tourism.

    Share
    Facebook
    Twitter
    WhatsApp
    Email
    Print
      Previous article145 Power Transmission Line Projects Under Study to Strengthen Nepal’s Electricity Grid
      Next articleDeforestation Surges Ahead of Upper Arun Project Construction
      OnlineNEF@Nepal

      RELATED ARTICLESMORE FROM AUTHOR

      News

      IPPAN Vice President Dangi Pledges “Golden Era” for Nepal’s Energy Sector, Calls for Major Policy Reforms

      News

      Supreme Court Directs Increase in Free Electricity from 480 MW Phukot Karnali

      News

      Kaligandaki ‘A’ Hydropower to Shut Down All Three Units for Maintenance from May 8

      My Tweets

      Subscribe via Email

      Enter your email address to subscribe and receive notifications of new posts by email.

      Join 8,903 other subscribers

      MOST POPULAR

      Deal signed to build access road to Arun-III hydro project

      January 6, 2016

      विद्युत् महशूल नबढाउन उद्योगीको अनुरोध

      April 3, 2017

      Rahughat Hydro Project Milestone: Longest Tunnel Link Achieves Breakthrough

      February 23, 2024

      Upper Trishuli 3A may come online ahead of schedule

      March 16, 2018
      Load more

      HOT NEWS

      International promoters propose for constructing 5 hydel projects

      News

      Power Summit 2023 , conclude with a focus on renewable energy...

      News

      सौर्य ऊर्जाका लागि लगानी सम्झौता

      Puwa Khola project gets production license

      An independent forum and an on-line channel for the Nepal energy markets(Hydropower, Wind, Biomass, Solar, Petroleum).
      Contact us: info@nepalenergyforum.com

      POPULAR POSTS

      NEA Electricity tariff rates

      July 16, 2023

      China’s Mega-Dam on the Yarlung Tsangpo: Geopolitical and Environmental Alarm

      December 28, 2024

      Water Clouds on the Tibetan Plateau

      May 12, 2016

      POPULAR CATEGORY

      • News3474
      • Article242
      • International111
      • Infrastructure39
      • Interview19
      • Events9
      • Notice9
      • Press Release4
      © NEF Online Pvt. Ltd