NepalEnergyForum

Invitation for Prequalification for Lot 2 (Electromechanical Works)

Nyadi Hydropwer Limited (NHL) is promoted by Butwal Power Company Limited (BPC). NHL is developing a 30  MW Capacity Nyadi Hydropower Project (NHP) in Western Region of Nepal. NHL intends to prequalify the Electromechanical contractors for the construction of the NHP. The Project is being financed by the International Finance  Corporation (a Subsidiary of World Bank Group) and Everest Bank Ltd Nepal (a joint venture of Punjab National Bank,  India).

Invitation for Prequalification for Lot 2 (Electromechanical Works)
Download Invitation Notice for 2nd Prequalification oct_2012_PDF 
Download Nyadi Re_PQ document_Sept 2012_PDF
Source : http://nhl.com.np